Boeing 787 Dreamliner: Flight Certificate Final Straight

Carrying out final checks on the new aircraft Boeing 787 Dreamliner The US Civil Aviation Authority (FAA) announced on Tuesday (15/2) emphasizing that it will not allow the manufacturer to proceed with the validation of the navigation of its aircraft on its own.

The FAA said it had informed Boeing of the decision, seeking to ensure that “Boeing’s quality control and production processes lead to the stable production of the 787 aircraft in accordance with the FAA’s design and construction rules.”

Boeing said in a statement that “it will continue to work transparently through the FAA’s detailed and rigorous procedures. .

What happens to the suspension of 787 aircraft deliveries

THE Boeing suspended deliveries of the 787 aircraft at the end of May, following concerns by the FAA about the inspection method proposed by the manufacturer.

Aircraft deliveries remain on hold as supervisors evaluate repairs and carry out inspections. Deliveries are expected to remain frozen for a few months.

The chairman of the Transport and Infrastructure Committee of the House of Representatives, Peter DeFazio, commented positively on the FAA’s moves “to implement the necessary steps to ensure the safety of the passenger public.” He underlined that the committee is investigating the production, but also the way of construction of the 787.

The 787 program remains at a low production rate, while its gradual return to production five is expected aircraft per month, as announced by Boeing.

Boeing also announced $ 3.5 billion in compensation for delays in aircraft deliveries, as well as $ 1 billion in compromises reached with its customers, as well as $ 1 billion in extraordinary production costs for aircraft manufacturing problems. but also related repairs and inspections for the mentioned aircraft, which has a high percentage of use of synthetic materials in its production.

Boeing shares rose 3.7% yesterday.

Source: News Beast

You may also like